Tuesday, November 25, 2008

Lights Fantastic

Like everything else, the lights are almost all installed.

The coach lights by the garage doors are almost all in. Two are still backordered. (silver circle on the left) The front porch light is in. The electricians are obviously still working since their ladder is still in the entry from putting up the light there.

Master vanity light.


















Master bedroom fan. I'm so excited about not having brass and white light fixtures. I like these dark ones much better.






Kitchen & breakfast area lights and tile installed. Still working on the under counter lights.

The tile backsplash is caulked now. Looking good.


We were there when they installed the study doors. They were FAST!




The fan kit is now installed on the back porch and the "home theatre" guy came and capped off all the surround sound pre-wiring.

The gutter guys just began their work. We watched them for a while. They are definitely masters of their trade.